KENBRIDGE PROJECT

SIOUX NARROWS, NORTHWESTERN ONTARIO

Key Highlights

622m Shaft In Place

4,753 Hectares

4.25% Ni Peak Grade

120,000m Drilled

Map of Kenbridge Nickel-Copper deposit with mineral claims and historic resource.
Aerial view of Tartisan Nickel project site with buildings and a large communication tower.
Kenbridge Project Highlighting Operational Exploration Shaft (1960s)
Tartisan Nickel Kenbridge Project underground mine plan with resource zones and open pit outline.
3D model of Tartisan Nickel's proposed open pit outline at Kenbridge Project.
Tartisan Nickel mining drill hole analysis showing mineralization zones and assay results.
Geological core sample analysis at Tartisan Nickel's Kenbridge Project.

About Kenbridge

Ni

Nickel

Cu

Copper

Co

Cobalt

Kenbridge is one of North America’s most advanced nickel sulphide copper deposits and one of the few that comes with significant infrastructure already in place. An existing 3-compartment shaft reaches 622 metres deep, with two developed underground levels and decades of prior drilling, metallurgical testing, and environmental baseline work behind it.

Since 2018, Tartisan has methodically checked every box that separates concepts from developments. A 7.5 million tonne mineral resource estimate, updated by independent consultants. A 2022 PEA showing a nine-year operation with $182.5 million in pre-tax value and a 3.5-year cash payback. Environmental baseline studies. Community engagement with Treaty #3 First Nations. Current drilling aimed at expanding the mineral resource estimate and proving depth potential.

The 2022 PEA, independently completed by P&E Mining Consultants, outlines a financially robust underground mining operation with a 9-year mine life, LOM revenues of $837 million, and pre-production capital of $133.7 million. The deposit remains open at depth, and ongoing drilling is designed to expand the resource, upgrade inferred tonnes, and test the considerable down-plunge potential that historical and recent holes have confirmed.

Existing infrastructure collapses timelines and slashes permitting risk. While competitors are still fighting for access roads alongside First Nations and environmental approvals, Kenbridge is actively moving to pre-feasibility. Recent holes confirm the deposit remains open at depth. Drill results continue to expand the resource case.

In a North American supply chain starved for domestic nickel and copper, that speed matters. It matters to automakers. It matters to battery makers. It matters to defense.

Ownership 100%

Access All-season road within 10km via Highway 71

Location Sioux Narrows, Northwestern Ontario

Infrastructure Existing shaft, All-season road within10km of deposit via Highway 71

Status Advanced Exploration, PEA Completed, Phase 2 Drilling in 2026

Property Size 4,753 Hectares

Currently Upcoming geophysics and Phase 2 drilling to expand resource in 2026

Next Step 2026 Pre-Feasibility Study

Kenbridge Timeline

2012
First Nations

Great Earth Law authorization received from Treaty #3 Grand Council

2018
Acquisition of Kenbridge Property

Tartisan acquires the project through Canadian Arrow Mines Limited

2021
Mineral Resource Estimate 

MRE amended and updated in 2022; extensional drilling program completed

2022
Preliminary Economic Assessment (PEA)

PEA completed with positive economics exceeding current market cap; view release here

2026
3,200m Phase 1 Drill Program

Phase 1 drill program completed (4 holes); high-grade results confirm depth continuity; view drill highlights here

2026
7,000m+ Phase 2 Drill Program

Phase 2 drill program in planning stage

First Nations Partnership

Built on Respect & Shared Prosperity

Tartisan's relationship with Treaty #3 is grounded in genuine reciprocity. We've been engaged since 2007 because community trust and benefit-sharing matter to how we operate.

Our Partnership:

  • Proven trust: Treaty #3 Grand Council granted Canadian Arrow Mines (our subsidiary) the first-ever Great Earth Law authorization for a resource company.
  • Long-term neighbors: Ongoing relationships with 4 neighboring communities (Naotkamegwanning, Northwest Angle #33 & #37, Onigaming) built on transparency and mutual benefit
  • Leadership endorsement: Recognized by the Ogichidaa (Grand Chief) as a leader in First Nation relations
Tartisan Nickel group photo outdoors at a company event or site.

Treaty #3 Communities Near Kenbridge

  • Naotkamegwanning (Whitefish)
  • Northwest Angle # 33
  • Northwest Angle # 37
  • Onigaming

Technical Summary

The Kenbridge Nickel Project has demonstrated compelling project economics through a positive Preliminary Economic Assessment (PEA), independently prepared by P&E Mining Consultants Inc. (Brampton, Ontario) under the supervision of Eugene J. Puritch, P.Eng., FEC, CET. The effective date of the Mineral Resource Estimate is July 6, 2022.

The PEA outlines a 9-year underground mine plan processing 1,500 tonnes per day — leveraging Kenbridge’s existing shaft infrastructure (2,042 ft / 622 m depth) to access higher-grade mineralization early in mine life, reducing capital intensity and accelerating payback. With a pre-tax IRR of 26% and an after-tax payback of just 3.5 years, Kenbridge stands as one of the most capital-efficient near-production nickel sulphide assets in North America..

All figures are in Canadian dollars unless otherwise noted.

Table 1 — Mineral Resource Estimate
Effective Date: July 6, 2022  |  Cut-off: C$100/t NSR
ClassTonnes (k)Ni (%)Ni (Mlb)Cu (%)Cu (Mlb)Co (%)Co (Mlb)NSR (C$/t)
Measured1,8670.9941.00.5020.60.0170.7184.40
Indicated1,5780.9533.00.5318.50.0090.3180.26
Measured + Indicated3,4450.9774.00.5239.10.0131.0182.51
Inferred1,0141.4732.70.6714.90.0110.2263.38
Table 2 — PEA Financial Highlights
ParameterPre-TaxAfter-Tax
Commodity Price Assumptions
Nickel (US$/lb)$10.00—
Copper (US$/lb)$4.00—
Cobalt (US$/lb)$26.00—
Exchange Rate (US$:C$)0.78—
Mine Plan
Life of Mine (years)9.0
Processing Rate (t/day)1,500
Payable Production (LOM)
Nickel (Mlb)52.6
Copper (Mlb)30.7
NiEq Total (Mlb)65.3
Average Annual NiEq Production (Mlb)7.3
Operating Costs
Mining ($/t mined)$38.93
Processing ($/t processed)$17.74
G&A ($/t processed)$7.96
Total Operating Cost ($/t processed)$64.64
NSR Royalty (after 1.5% buyback)2.50%
Cash Costs (US$/lb NiEq)$3.76
AISC (US$/lb NiEq)$4.99
Capital Costs
Initial Capital ($M)$133.7
Sustaining Capital ($M)$93.1
Closure Costs ($M)$10.0
Total LOM Capital ($M)$227.0
Project Returns
Undiscounted NPV ($M)$286$181
NPV at 5% Discount Rate ($M)$183$109
IRR26%20%
Payback Period (years)3.43.5

Cautionary Statement: This PEA is preliminary in nature and includes Inferred Mineral Resources, which are considered too speculative for use in economic analysis except as permitted under NI 43-101 for PEA studies. There is no guarantee that the project economics described herein will be achieved.

Filed on SEDAR+ in accordance with National Instrument 43-101. View news release here.