1286 Stephens Bay Road, Bracebridge, Ontario P1L 1X2 Toronto, Canada, June 23, 2026 – Tartisan Nickel Corp. (CSE: TN) (OTCQX: TTSRF) (FSE: 8TA) (“Tartisan”, ...
TURTLE POND PROJECT
DRYDEN REGION, NW ONTARIO
Key Highlights
TDEM Complete
3,454 Hectares
4.53% Ni High Grade
70km East of Kenbridge


Turtle Pond Project
Ni
Nickel
Cu
Copper
Co
Cobalt
Ownership 100%
Commodities Nickel, Copper, Cobalt
Location ~40km south of Dryden, Northwestern Ontario
Status Early-stage exploration
Property Size 3,454 hectares
Next Steps Mapping, sampling, trenching, and diamond drilling
Turtle Pond Timeline
Historical drilling and surface sampling at Glatz, Double E, and Night Danger showings
Reconnaissance mapping program completed; historical drill collars located; showings confirmed
Time Domain Electromagnetic (TDEM) geophysical surveys across the property
Mapping, sampling, trenching, and diamond drilling
Technical Summary
All geological data and drill results cited below are sourced from Tartisan Nickel Corp.'s SEDAR-filed news release dated February 10, 2026, which draws on historical exploration records on file with the Ontario Ministry of Northern Development and Mines (MNDM) and Canadian Arrow Mines Limited. Technical content reviewed and approved by Dean MacEachern, P.Geo., Independent Qualified Person under NI 43-101.
The Turtle Pond Project covers 161 claims across 3,375 hectares approximately 40 kilometres south of Dryden, Ontario — in the same prolific northwestern Ontario nickel belt as Tartisan's flagship Kenbridge Nickel-Copper-Cobalt Project, located 70 kilometres to the west. The property hosts three distinct nickel-copper sulphide showings: Glatz, Double E, and Night Danger.
At the Glatz showing, nickel-copper sulphide mineralization has been identified across twelve trenches along a 700-metre trend, in a zone up to 40 metres wide that remains open along strike and at depth. Historical grab samples returned up to 1.95% Ni, with 2007 surface sampling confirming grades including 1.28% Ni and 0.26% Cu (Trench 3) and 4.06% Cu (Trench 4). Six drill holes were completed, with hole GZ-09-02 returning 0.34% Ni, 0.16% Cu, and 0.02% Co over 5.9 metres.
The Double E showing — identified on a 2008 airborne VTEM anomaly — intersected a compelling near-surface nickel-copper-PGE zone. Hole EE-09-02 returned 4.2 metres of 0.81% Ni, 0.52% Cu, 0.20 g/t Pt, 0.16 g/t Pd, and 0.20 g/t Au at 25.5 metres depth, including a higher-grade interval of 2 metres grading 1.35% Ni, 0.81% Cu, 0.36 g/t Pt, 0.27 g/t Pd, and 0.31 g/t Au. A second zone at 135 metres depth returned 8.2 metres of 0.55% Ni and 0.38% Cu.
At the Night Danger showing, 2009–2010 drilling intersected a nine-metre sulphide zone assaying 0.57% Ni and 0.45% Cu at 79 metres depth, with two sub-intervals exceeding 1% nickel. Hole ND-10-1 returned a high-grade intercept of 4.53% Ni over 0.7 metres at 57.5 metres depth.
A Time-Domain Electromagnetic (TDEM) geophysical survey was completed over the property in late 2024 by Expert Geophysics Limited to define drill targets for the planned 2026–27 exploration program, which is expected to include surface sampling and diamond drilling.
News
Tartisan Nickel Corp. Acquires Nickel-Copper Claims at Turtle Pond, Northwestern Ontario
Toronto, Ontario--(Newsfile Corp. - March 11, 2026) - Tartisan Nickel Corp. (CSE: TN) (OTCQX: TTSRF) (FSE: 8TA) ("Tartisan", or the "Company") is pleased to an ...
Tartisan Nickel Corp. Acquires Additional Nickel-Copper Claims at Turtle Pond, Northwestern Ontario
Toronto, Ontario--(Newsfile Corp. - February 10, 2026) - Tartisan Nickel Corp. (CSE: TN) (OTCQB: TTSRF) (FSE: 8TA) ("Tartisan", or the "Company") is pleased to ...










